Testing results, a wide scope of test assures a better structuarally engineered support system Advanced Support Products Inc, the industry leader in pipe and equipment support systems

Engineering Calculations for Adjustable Support Bridge Assemblies

(For Rubber EcoCurbs)

Subject:
Limited Engineering Calculations for
Adjustable Support Bridge Assemblies
as manufactured by
Advanced Support Products, Inc.
Date: November 7, 2000

Download
Download

Report done by:
M & Q Engineering, Inc.
1801 Kingwood Drive, Suite 250
Kingwood, Texas 77339


(fig. 1) Pipe Hanger Design Uplift Resistance
(figs. 2, 3 & 4) Typical Roof Loads Due to Gravity Bearing Stresses
(fig. 2) Minimum Pipe Hanger Assembly
(fig. 3) Medium Pipe Hanger Assembly
(fig. 4) Maximum Pipe Hanger Assembly
(fig. 5) Product Information – Standard Bases

The data utilized for these calculations was obtained from Unistrut for the structural assemblies and from Ginnell for the pipe hangers. The information for the rubber molded bases was obtained from Advanced Support Products, Inc. product Data.

The calculations performed are limited and only indicated the static loads that would be exerted on a roof deck by the support assemblies including standard sections of single or multiple lengths of pipe conveying natural gas and water.

The piping and hanger assemblies in this report are considered "dead" loads and should be taken into account during structural design of the roof system. The hanger assembly loads in the attached tables are intended to be used by the structural designer and provide the information required to properly evaluate the complete roof system.

The products and their characteristics were tested by Advanced Support Products, Inc. and represent the basis for our calculations. Roof membrane system analysis as well as long term performance of the products was not part of the calculation process. The following assumptions were taken into account for the calculations:

  • Placement of load on pipe supports was assumed to be symmetrical
  • Performance of the products at other than static loading was not part of the calculation process.
  • Hanger assemblies and piping were assumed to be placed on a horizontal surface and pipe supports are normal to pipe.

Conclusions:

Based on our inspection and analysis of the product design, the load capacity values at each point of support of the pipe hanger assemblies, including the weight of piping are all less than the maximum allowable stresses for typical roof deck insulations types currently in use (5psi maximum). Therefore, the Adjustable Support Bridge Assemblies as manufactured by Advanced Support Products, Inc. meet Factory Mutual Research Corporation's recommendation that the design uplift resistance for base should not exceed half of the ultimate design uplift resistance of the roof cover system. The uplift resistance therefore, is dependent on the uplift rating of the roof cover system.

(top)

(fig. 1) Pipe Hanger Design Uplift Resistance


Advanced Support Products, Inc.  Uplift Resistance
Base Size FM Wind Uplift Rating
  60 90 150 180
12” x 12” 30 45 75 90
7.25” x 6” 9.1 13.1 22.7 27.2
7.25” x 9” 13.6 20.4 34.0 65.3
7.25” x 13” 19.6 29.5 49.1 58.9

(fig. 2) Typical Roof Loads Due to Gravity Bearing Stresses

(Minimum Pipe Hanger Assembly)

Curb Area: 348 sq.in.
Curb Weight: 32.0 lbs.
Frame Weight: 29.0 lbs.
Hanger Weight: 08.0 lbs.
Assembly Weight: 69.0 lbs. 1 pipe
77.0 lbs. 2 pipes

Pipe Diameter Quantity Pipe Contents Pipe Support Spacing
6 feet 8 feet 10 feet
4 inch 1 water 167.0 lbs 199.0 lbs. 229.0 lbs
0.48 psi 0.57 psi 0.66 psi
2 water 273.0 lbs 337.0 lbs 397.0 lbs
0.78 psi 0.97 psi 1.14 psi
6 inch 1 water 259.0 lbs 319.0 lbs 379.0 lbs
0.74 psi 0.92 psi 1.09 psi
2 water 457.0 lbs 577.0 lbs 697.0 lbs
1.31 psi 1.66 psi 2.00 psi

The bearing stresses indicated above reflect utilization of an assembly consisting of 4 each CCB 1806 Brace Bridges, 4 each CL 18 Channel Legs and 2 each ACB 18 Adjustable Cross Bars.

(fig. 3) Typical Roof Loads Due to Gravity Bearing Stresses

(Medium Pipe Hanger Assembly)

Curb Area: 522 sq.in.
Curb Weight: 48.0 lbs.
Frame Weight: 29.0 lbs.
Hanger Weight: 08.0 lbs.
Assembly Weight: 85.0 lbs. 1 pipe
93.0 lbs. 2 pipe
101.0 lbs 3 pipes

Pipe Diameter Quantity Pipe Contents Pipe Support Spacing
6 feet 8 feet 10 feet
4 inch 1 Gas lbs
psi
150 171 195
0.29 0.33 0.37
Water lbs
psi
183 215 245
0.35 0.41 0.47
2 Gas lbs
psi
223 265 313
0.43 0.51 0.60
Water lbs
psi
289 353 413
0.55 0.68 0.79
3 Gas lbs
psi
296 359 431
0.57 0.69 0.83
Water lbs
psi
395 491 581
0.76 0.94 1.11
6 inch 1 Gas lbs
psi
195 235 275
0.37 0.45 0.53
Water lbs
psi
275 335 395
0.53 0.64 0.76
2 Gas lbs
psi
313 393 473
0.60 0.75 0.91
Water lbs
psi
473 593 713
0.91 1.14 1.37
3 Gas lbs
psi
431 551 671
0.83 1.06 1.29
Water lbs
psi
671 851 1031
1.29 1.63 1.98

The bearing stresses indicated above reflect utilization of an assembly consisting of 4 each CCB 1806 Brace Bridges, 4 each CL 18 Channel Legs and 2 each ACB 18 Adjustable Cross Bars.

(top)

 

(fig. 4) Typical Roof Loads Due to Gravity Bearing Stresses

(Maximum Pipe Hanger Assembly)

Curb Area: 754 sq.in.
Curb Weight: 80.0 lbs.
Frame Weight: 29.0 lbs.
Hanger Weight: 08.0 lbs.
Assembly Weight: 117.0 lbs. 1 pipe
125.0 lbs. 2 pipe
133.0 lbs 3 pipes
Pipe Diameter Quantity Pipe Contents Pipe Support Spacing
6 feet 8 feet 10 feet
4 inch 1 Gas lbs
psi
182 203 227
0.29 0.27 0.30
Water lbs
psi
215 247 277
0.29 0.33 0.37
2 Gas lbs
psi
255 297 345
0.34 0.39 0.46
Water lbs
psi
321 385 445
0.43 0.51 0.59
3 Gas lbs
psi
328 391 463
0.44 0.52 0.61
Water lbs
psi
427 523 613
0.57 0.69 0.81
6 inch 1 Gas lbs
psi
195 267 307
0.37 0.35 0.41
Water lbs
psi
275 367 427
0.53 0.49 0.57
2 Gas lbs
psi
313 425 505
0.60 0.56 0.91
Water lbs
psi
473 625 745
0.91 0.83 0.99
3 Gas lbs
psi
431 583 703
0.83 0.77 0.93
Water lbs
psi
671 883 1063
1.29 1.17 1.41
8 inch 1 Gas lbs
psi
287 347 407
0.38 0.46 0.54
Water lbs
psi
417 517 617
0.55 0.69 0.82
2 Gas lbs
psi
465 585 705
0.62 0.78 0.94
Water lbs
psi
725 925 1125
0.96 1.23 1.49
10 inch 1 Gas lbs
psi
357 437 527
0.47 0.58 0.70
Water lbs
psi
567 717 867
0.75 0.95 1.15
2 Gas lbs
psi
605 765 945
0.80 1.01 1.25
Water lbs
psi
1025 1325 1625
1.36 1.76 2.16
12 inch 1 Gas lbs
psi
417 517 617
0.55 0.69 0.82
Water lbs
psi
707 907 1107
0.94 1.20 1.47

The bearing stresses indicated above reflect utilization of an assembly consisting of 4 each CCB 1806 Brace Bridges, 4 each CL 18 Channel Legs and 2 each ACB 18 Adjustable Cross Bars.

(top)

(fig. 5) Product Information - Standard Bases (Rubber)


  Minimum Base Medium Base Maximum Base
Size (inches) 7.25 x 6 7.25 x 9 7.25 x 13
Weight 4 lbs. 6 lbs. 10 lbs.
Area 43.50 sq.in. 65.25 sq.in. 94.25 sq.in.
Area per Support Bridge
4 bases 174 sq.in.  261 sq.in. 377 sq.in.
Area per Pipe Section
8 bases 348 sq.in. 522 sq.in. 754 sq.in.